Procedure:
In this project you will plan the redevelopment of a (fictitious) existing industrial brownfield site in Noblesville, IN. The unit activities will guide you as you create a redevelopment plan to reuse the facility as a public library.
The existing building is approximately 76ft x 124ft and 20ft tall and is gutted. No interior walls or fixtures remain. You will utilize the existing structure to its fullest extent and add a partial second floor to the structure. The part of the existing roof that is not enclosed for the new second floor will be converted to a green roof that will be accessible to the public.
You will redesign the existing building to create a plan for renovating the structure to serve as a public library. As necessary, you will replace existing building components or add new components to provide a safe and efficient building with adequate utilities and services. You will also create a site design that will provide sufficient parking, desirable traffic flow, and appropriate grading and storm water management.
The existing building is approximately 76ft x 124ft and 20ft tall and is gutted. No interior walls or fixtures remain. You will utilize the existing structure to its fullest extent and add a partial second floor to the structure. The part of the existing roof that is not enclosed for the new second floor will be converted to a green roof that will be accessible to the public.
You will redesign the existing building to create a plan for renovating the structure to serve as a public library. As necessary, you will replace existing building components or add new components to provide a safe and efficient building with adequate utilities and services. You will also create a site design that will provide sufficient parking, desirable traffic flow, and appropriate grading and storm water management.